韦德app客户端平台

Company News
Home > News Center > Company News

New breakthroughs in key projects in the fourth quarter

Panda Electronics  2022-11-20
Since the fourth quarter, all units of the company have resolutely implemented the decisions and arrangements of Panda Electronics to ensure the smooth completion of the annual goals and tasks.

Recently, Nantong Metro Line 1, the first metro line in Nantong built by Panda Information, was officially opened. Among them, the dedicated wireless communication system contracted by Panda Information provides reliable wired and wireless transmission channels, audio and video playing tools and various communication guarantees for all metro operation systems. Based on the characteristics of Nantong Metro, the company actively innovated, optimized the system scheme and product functions, and successively developed 800M secondary development dispatching system, secondary development network management system, whole network recording system and terminal vehicle mounted station, to ensure the successful completion of the key node task of "wireless 800M whole line connection" issued by Nantong Metro. It has opened the "communication channel" for the whole line joint commissioning, and to provide reliable guarantee for the subsequent moving train commissioning.
Since the beginning of this year, the Panda Equipment has been accurately positioned and continuously promoted, and the market development has made progress. Recently, the company won the bid for a 5G digital smart factory project for intelligent water meters, marking another solid step for Panda Equipment in the intelligent water meter manufacturing industry. The main construction contents of the project include intelligent warehousing, intelligent logistics, automatic production line, information system and 5G customized network + industrial Internet platform. The total construction scale of the smart factory is more than 20,000 square meters, which is divided into two assembly workshops on the first floor and the second floor. The warehouse is designed as a cross floor warehouse with a total height of more than 10 meters, meeting the storage requirements of 150,000 finished meters; The automatic production line includes two automatic assembly lines for intelligent water meter and two automatic assembly lines for semi-finished products, with a total of more than 70 Panda Industrial Robots and 10 AGV transfer robots. Panda equipment automation integration technology - iManuf Industrial Internet platform and core equipment industrial robot will be fully applied and verified in this project, expanding the application scenario of Panda Robot, and forming a new intelligent manufacturing solution.


新澳门葡京下载 金沙app下载 银河app手机版下载 金沙官方网站下载 必威app登录 老金沙app下载 金沙河集团官网 必威体育主页 必威登录线路 必威bet体育